A nipa hut is a timeless native housing structure indigenous to the Pacific islands. Nipas are commonly constructed indigenous machete-cut bamboo, with the logs put through chopped cutouts in the corresponding logs. Thatched roofs, pull-up window panels and also flooring of split bamboo make the nipa livable in all yet the many severe weather. Their construction permits them to it is in disassembled, moved and reassembled quickly and also easily. A nipa hut renders a an excellent rustic cabana. While they room still constructed using bamboo, a 16-foot-square nipa hut deserve to be built of PVC pipe, plywood flooring and also vertical window blinds because that shingles.

You are watching: How to build a nipa hut


Frame the Nipa Structure


*
if (sources.length) this.parentNode.removeChild(sources<0>); rather this.onerror = null; this.src = fallback; )( <...this.parentNode.querySelectorAll("source")>, arguments<0>.target.currentSrc.replace(//$/, ""), "/public/images/logo-fallback.png" )" loading="lazy">
Build a nipa hut as a cabana using PVC pipe.

Step 1

usage a tape measure and marker to note eight pieces of 4-inch PVC pipe 16 feet long. Use a reciprocating witnessed to reduced the pipe with right-angle cuts. Drill 1/2-inch holes v all the end of all the pipes, 8 inches from the ends. Arrange castle in two teams of 4 squares and also bolt each team together, with 9-inch carriage bolts, into a square. Choose one next of the an initial square to it is in the former of the nipa. Drill 1/2-inch holes v the exterior ends the the front-corner pipe extensions, 2 inches native the ends.

Step 2

Measure, mark and also cut four an ext pieces that 4-inch PVC pipeline 7 feet in length. Drill 1/2-inch holes, identically right into all 4 pieces, that are at 2 inches indigenous one end and also 12 inches native the other end. Drill both holes on the same side the the pipe. Was standing a 7-foot pipeline vertically in between the pipe extensions at the front edge of the first square and lift the finish of the square to complement the hole in the vertical pipe the is 12 inches turn off the ground. Bolt the pipes together at this allude with one more 9-inch carriage bolt. Repeat this process at all four corners that the square, constructing the floor joist for the hut.

Step 3

With two world assisting, background the other pipe square and bolt it come the top of the upright pipes. Cut another 16-foot item of 4-inch PVC pipe and lay it, off-center by 4 inches, between the front and also rear upper 4-inch pipes. Drill the same measurement holes and also bolt this truss-connector item in place.


Step 4

Measure and also cut 2 9-foot piece of 3-inch PVC pipe. Measure, mark and cut one inward, 45-degree miter in one end of both pieces. Drill a 1/2-inch hole through the mitered ends of the 9-foot pieces and also bolt them in addition to a 5-inch carriage bolt, right into an arrow-shaped assembly. Mount, drill and also bolt this assembly top top the top, front end of the top square. Repeat this procedure and mount the second arrow-shaped truss in ~ the back of the hut.

Step 5

Measure and cut another 16-foot item of 4-inch PVC pipe together the king log. Bolt it, ~ above the underside that the mitered joint, between the prior and ago trusses. Measure and also place four marks on every side that the king log every 38 inches along the pipe. Reduced eight 3-inch pieces of PVC pipe 9 feet in length. Lay them through one finish on the optimal of the king log and the other against the side log in in the top square. Miter the height ends and also drill and bolt lock in place with carriage bolts. Cut a 4 1/2-foot-long piece of 3-inch PVC pipe and drill and mount the vertically in between the king log and the center point of the 16-foot facility line pipe listed below it.

Step 6

Cut 4 16-foot piece of 3-inch PVC pipe and also bolt them come the vertical pipes, 5 feet above the floor. Attach vertical 3-inch assistance pipes to the center of them, bolting the various other ends come the bottom square. Frame and also bolt in place added pieces that 2-inch PVC pipeline that structure the 30-by-72-inch doorway and also the centered, 4-by-8-foot side home window openings top top the political parties and earlier of the hut.

Finish the Roof and Interior that the Hut

Step 1

Lay enough 4-inch strips of vertical patio-door blinds throughout the roof, starting at the bottom, to shingle the hut. Drill 1/4-inch holes with the former and ago ends of the strips and screw lock onto the rafters through 1/4-inch machine screws. Cut much more blinds and also mount castle vertically in the triangles above the prior and ago trusses, close up door in the structure.

Step 2

Cut and bolt in location six 3-inch pieces of PVC pipe for the floor joists. Bolting them come 12-inch pieces of 4-inch pipe to offer as floor-support stanchions and also to the front/back pipe in the bottom square. Cut and also lay sufficient pieces the 3/4-inch plywood to cover the joists for the floor. Cut extr pieces of plywood to cover the lower inside surface of the walls.

Step 3

Cut a 30-by-72-inch piece of 3/4-inch plywood for the door. Screw on 2 4-inch hinges and screw the door ~ above the upright pipe in the best front edge of the hut.

Step 4

Screw two 4-inch hinges top top a 4-by-8-foot piece of latticework, at 2 and also 6 feet from one end and also screw-attach the lattice come the top pipe over the window opening. Repeat this on the political parties and earlier of the hut. Measure and cut the long dimension of an additional piece the lattice come fit the window opening next to the door, and screw it in place.

See more: Is Klay Thompson Related To Tristan Thompson, Are Klay And Tristan Thompson Related

Step 5

Drill and attach four screw rings, into the center line pipe in the upper square. Tie a size of 1/4-inch nylon cord come the lower, facility edge that the lattices and also run it v the screw rings and down just above head level. Lift the lattices to ceiling height, tying the cord come the about the screw ring.